
162 cm
Avg annual snowfall
56
Snow days a year
24 hr
Bylaw clearing window
$1,000
Bylaw fine for lot snow on the road
Commercial snow and ice management in Stone Ridge & the South Side
Stone Ridge is the south-side growth area around 108 Street and 84 Avenue, built out over the last decade around the Community Knowledge Campus and the Eastlink Centre, with newer commercial pads, professional offices, clinics and a heavy component of multi-family and condominium property alongside them.
Newer does not mean easier. New commercial builds are the sites where plow damage happens, because the landscaping, irrigation heads, curb stops and bollards are all still where the developer put them and none of it is marked. The City also notes that boulevard snow storage can extend up to four metres back from the curb, which on a new site is exactly where the irrigation and the new trees are.
The other Stone Ridge characteristic is traffic in peaks. School, campus and recreation traffic arrives in waves rather than a steady stream, which means a clearing window that works for a strip plaza does not work here.

Property types we service in Stone Ridge & the South Side
Roads and access
- 108 Street / Highway 40 — a City Priority 1 route
- 84 Avenue — a City Priority 1 route
- 68 Avenue — a City Priority 1 route
- Knowledge Way
- Poplar Drive and Mission Heights Drive — City Priority 2 routes nearby
New sites, condo boards and peak traffic
- New builds have unmarked curb stops, bollards, irrigation heads and young trees. Everything fragile gets staked before the first snowfall or it gets replaced in spring.
- City boulevard snow storage can extend up to four metres back from the curb, which on a newly landscaped commercial frontage is directly over the irrigation and the new plantings.
- Condominium and multi-family common property has a board, a budget cycle and an AGM. Quotes need to be scoped and priced in a form a board can actually approve.
- Traffic here arrives in peaks around school, campus and recreation schedules, so the clearing window has to sit outside those peaks rather than inside them.
- Pedestrian connections between parking areas and buildings carry a lot of foot traffic in the dark at both ends of the winter day and need consistent traction material.
- Nearby Priority 2 routes are cleared after Priority 1, so approaches on collector roads stay rough longer than the arterials do.
The Grande Prairie bylaw that costs commercial owners money
Under City of Grande Prairie Traffic Bylaw C-1166 s.37.1A, placing snow or ice removed from a commercial or industrial property onto a highway or other public property carries a $1,000 fine — ten times the $100 penalty that applies to a residential property under s.37.1. Section 37.3 then requires the snow to be removed within 24 hours, and s.37.4–37.5 let the City remove it and bill the full cost back to whoever put it there.
Separately, s.38.1 requires the occupant or owner of a property adjacent to a sidewalk to clear snow and ice from that sidewalk within 24 hours following the most recent deposit of snow or ice. Read that wording carefully: the clock runs from the most recent deposit, not from the end of the storm. In a multi-day event it restarts. If the walk is not cleared, s.38.4 lets the City clear it and add the cost to the property's tax roll.
A cheap operator who blades your lot into the street is not saving you money. They are exposing you to a $1,000 ticket, a cleanup order, and a City invoice.
One distinction worth making, because it trips people up: the City now clears the windrows it leaves across residential driveway entrances during residential plowing, and says so on its own snow clearing page. That commitment is about driveways on residential routes. It does not cover commercial approaches on Priority 1 and Priority 2 arterials, which are cleared to a different standard and on a different schedule. If your entrance is on an arterial, the plow line across it is still yours to move.
Read the full breakdown of the 24-hour rule
City of Grande Prairie Traffic Bylaw C-1166, office consolidation as amended through C-1166J, effective 21 August 2023, ss. 37 and 38 and Schedule 1.
Where the snow goes in Stone Ridge & the South Side
On a new commercial site, the wrong pile location costs you landscaping. Piles go clear of irrigation heads, young trees and the boulevard storage zone, and clear of storm drains that back up in the first thaw.
Condominium common property usually has room to stack but needs the pile locations documented so the board is not fielding owner complaints about lost visitor stalls in February.
Snow pushed onto 108 Street, 84 Avenue or any other public road from a commercial property is a $1,000 offence under C-1166 s.37.1A.
How a PWW commercial snow contract works
What every commercial snow contract with us includes, Stone Ridge & the South Side included.
Written trigger depth
Service starts at an accumulation depth agreed in the contract, not when somebody decides it looks bad enough. You know exactly what buys you a visit.
Named response window
A finish time tied to your operation — before dayshift, before open, before the morning rush — rather than a vague same-day promise.
In-storm service
On contract sites we work during the event at the trigger depth instead of waiting for it to end. Snow left to pack under traffic becomes ice you have to chip off.
Separate ice-management cycle
Sanding and de-icing run on their own schedule, not bundled into the plow pass. The City applies ice control on priority routes from October 15 to April 15; your site needs the same continuity.
Documented service log
Date, time, conditions, areas cleared and material applied, recorded every visit. A slip-and-fall claim can arrive more than a year later and the log is what answers it.
Pre-season site walk
Curb stops, bollards, irrigation heads, cart corrals, fire routes and pile locations all mapped and staked before the first snowfall, so nothing gets found by a blade in the dark.
Related services for Stone Ridge & the South Side properties
Frequently asked questions — commercial snow removal in Stone Ridge & the South Side
Our site is new. How do you avoid damaging the landscaping?
A site walk before the season with everything fragile staked — curb stops, bollards, irrigation heads, young trees — and the same operators on the same site all winter. Pile locations are set clear of the boulevard storage zone, which the City notes can run up to four metres back from the curb.
Can you quote in a format our condo board can approve?
Yes. Board quotes get a defined scope, a seasonal price with the trigger depth and response window written in, and the pile locations documented, so the board is approving a known number rather than an open-ended hourly rate.
Can you work around school and recreation traffic?
Yes. Clearing windows on Stone Ridge sites are set against the actual peaks rather than a standard start time, because the gap between the morning and midday peaks is usually where the work has to happen.
Do you handle sidewalks and pedestrian connections too?
Yes, under a sidewalk clearing contract with a documented log. On multi-family and institutional property the pedestrian connections carry more liability than the parking does.