Call Now — (587) 849-0991
    Snow season · Local guide

    Grande Prairie snow removal schedule: what the City clears, when, and what's left to you

    By Brenden Lidder, Owner, PWW Services Inc. · Published September 19, 2026

    The short answer

    The City of Grande Prairie clears snow in priority order. Priority 1 arterials such as 100 Street, 100 Avenue, 108 Street and Resources Road are done first, within about 24 hours of the snowfall ending. Priority 2 collectors and bus routes come next. City-owned roads in commercial and industrial areas are Priority 3, on roughly a five-day target. Residential streets run on a two-week rotation once more than 10 cm has accumulated. Private lots, driveways and the sidewalk beside your property are never included.

    ~24 hours

    Target for Priority 1 roads after the snow stops.

    source

    ~5 days

    Target for City-owned commercial and industrial area roads (Priority 3).

    source

    10 cm

    Accumulation that triggers residential plowing, on a two-week A/B rotation, Monday to Friday 8 a.m. to 5 p.m.

    source

    Oct 15 – Apr 15

    The City's ice control season on priority routes.

    source

    How the priority system works

    TierWhat it coversExamplesTarget
    Priority 1Main arterials, high-volume access, emergency corridors100 Street, 100 Avenue, 102 Street, 108 Avenue, 84 Avenue, 68 Avenue, Resources Road, Highway 40 / Wapiti RoadWithin about 24 hours after snowfall ends
    Priority 2Major collectors, bus routes, permanent snow routesCrystal Lake Drive, Mission Heights Drive, Poplar Drive, Royal Oaks DriveAfter Priority 1
    Priority 3City-owned roads in industrial and commercial areasAbout 5 days
    ResidentialNeighbourhood streets, two-week A/B rotationTriggered above 10 cm

    Crews work down the list. A second snowfall before they finish sends them back to Priority 1, which is why a residential street can wait longer than the rotation suggests in a busy stretch.

    Where the City puts the snow

    Priority 1 snow is pushed past the curb onto City boulevards. Priority 2 snow is windrowed to the centre of the road and then removed. Residential snow is piled at the street sides, on boulevards or in the centre of cul-de-sacs. Boulevard storage can extend up to four metres back from the curb, which matters if you have landscaping or irrigation near the road.

    The City's snow dump on Park Road is for City use only.

    Parking bans and snow routes

    • Parking bans apply to Priority 1 and 2 roads. While a ban is active there is no parking Monday to Friday, 7 a.m. to 9 p.m.
    • Parking beside a windrow is prohibited at any time.
    • On residential plow days, vehicles need to be off the street from 8 a.m. to 5 p.m.
    • Under Traffic Bylaw C-1166, a vehicle left on a marked snow route after a declaration can be fined and towed at the owner's expense. Temporary snow routes run for 5 business days after declaration and can be extended by 3.

    Windrows across your driveway

    The City's residential snow clearing page now says crews will clear the windrows left across driveway entrances during residential plowing, and that residents may still need to clear a much smaller remaining area. That applies to residential driveway entrances on residential plow routes. It does not cover commercial approaches on Priority 1 and 2 arterials.

    What the City never clears

    • Private business roads and parking lots. The Priority 3 wording excludes them outright.
    • Your driveway and private walkways.
    • The public sidewalk beside your property. Bylaw C-1166 section 38.1 gives the owner or occupant 24 hours from the most recent deposit of snow or ice. In a multi-day storm the clock restarts each time it snows. The fine is $100, and the City can clear it, bill you and add the cost to your tax roll.
    • Snow you push onto the road. $100 from a residential property. $1,000 from a commercial or industrial property under section 37.1A.

    Outside the city limits

    The County of Grande Prairie clears about 3,700 km of road on its own service levels: high-volume roads at 8 cm within 3 business days, gravel roads at 15 cm within 5 business days, and hamlets and residential subdivisions at 15 cm on roughly a 12-day cycle. Operations may be suspended at −35 °C or colder. County sidewalks fall under Community Standards Bylaw 3098. Sexsmith, Wembley, Beaverlodge and Hythe set their own rules.

    Questions people ask

    The City does the road. Who does your lot?

    Send the address and we'll send back a written scope and a price for the part the City doesn't touch.